Custom Search

Popular Posts

Showing posts with label parallel strategy. Show all posts
Showing posts with label parallel strategy. Show all posts

Friday, April 11, 2014

INFORMATION SYSTEM IMPLEMENTATION AND MAINTENANCE

Information Systems Life Cycle can be divided into three broad categories. 




IMPLEMENTATION AND MAINTENANCE
The remaining steps in the systems development process translate the solution specifications established during systems analysis and design into a fully operational information system. These concluding steps consist of programming, testing, conversion, and production and maintenance. 

1. Programming

The process of translating design specifications into software for the computer constitutes a smaller portion of the systems development cycle than design and perhaps the testing activities. But it here, in providing the actual instructions for the machine, that the heart of the system takes shape. During the programming stage, system specifications that were prepared during the design stage are translated into program code. On the basis of detailed design documents for files, transaction and report layouts, and other design details, specifications for each program in the system are prepared. 

EvoWP has an incredible listing of single page wordpress themes that's worth checking out. This is a list of only the very best premium themes around and it's frequently updated.
Some systems development projects assign programming tasks to specialists whose work consists exclusively of coding programs. Other projects prefer programmer/ analysts who both design and program functions. Since large systems entail many programs with thousands – even hundreds of thousands – of lines of code, programming teams are frequently used. Moreover, even if an entire system can be programmed by a single individual, the quality of the software will be higher if it is subject to group review. 

READ MORE...
Blog Widget by LinkWithin